The best time of year to paint a house exterior in Maryland

Late spring and early fall are the sweet spots, but the real rule is surface temperature and dew point, not the date on the calendar.

Painted colonial exterior with fresh white trim and dark shutters in Bethesda, Maryland

The short answer

In Montgomery County, Prince George's County and Washington, DC, the most reliable exterior painting months are May through June and September through mid October. Both windows offer mild temperatures, moderate humidity and enough daylight for a full working day.

July and August work too, as long as the crew follows the shade around the house and avoids painting walls in direct afternoon sun. April and late October can be good or bad depending on the week. From November through March, most days in this region are too cold or too damp for exterior coatings to cure properly.

What exterior paint actually needs

Every exterior paint label lists a minimum air and surface temperature. For most modern acrylic house paints it is somewhere between 35 and 50 degrees Fahrenheit, and it must stay above that while the paint dries, including overnight. The surface also has to stay at least 5 degrees above the dew point, or moisture condenses on the wall and the paint can wash out, streak or fail to bond.

Humidity matters as much as temperature. Fresh latex paint that gets hit by heavy evening dew can show surfactant leaching: sticky, brownish streaks that appear a day or two later. It is mostly cosmetic and washes off, but it is avoidable by stopping work early enough for the paint to set before the dew falls.

Why fall days start late and end early

Fall is a favorite season for exterior work here, with dry air and comfortable temperatures. The catch is the length of the usable day. Cold, clear nights leave siding wet with dew until mid morning, and the dew point catches up with the falling surface temperature by mid afternoon. A September day might allow eight hours of painting. A late October day might allow four.

That is why we plan fall exterior jobs by the side of the house. East walls dry first in the morning, west walls stay warm latest in the afternoon, and north walls may only be paintable in a short window around midday. Our exterior painting crews schedule each elevation around that window instead of forcing a full day.

Why fall exterior days start late and end earlyAn illustrative October day in Montgomery County, not a forecast. We paint only while the surface stays at least 5°F above the dew point, and stop early enough for the paint to dry before evening dew.
Why fall exterior days start late and end earlyLine chart of wall surface temperature and dew point from 6 am to 7 pm. The dew point stays near 48°F, so the minimum surface temperature is about 53°F. The wall stays below that until about 9:30 am and then needs time to dry off, so painting runs from 10 am to 3 pm. From 3 pm until about 5:45 pm the paint dries while the wall is still warm enough. After that the wall cools below the limit and dew returns.Wall damp or too coldPaint windowDrying time40°50°60°70°6 am8 am10 amnoon2 pm4 pm6 pmWall surface temperatureDew point plus 5°F (minimum)Dew pointWhy fall exterior days start late and end earlyLine chart of wall surface temperature and dew point from 6 am to 7 pm. The dew point stays near 48°F, so the minimum surface temperature is about 53°F. The wall stays below that until about 9:30 am and then needs time to dry off, so painting runs from 10 am to 3 pm. From 3 pm until about 5:45 pm the paint dries while the wall is still warm enough. After that the wall cools below the limit and dew returns.Wall damp ortoo coldPaint windowDryingtime40°50°60°70°6 am9 amnoon3 pm6 pmWall surface temperatureDew point plus 5°F (minimum)Dew point

A month by month guide

Interior projects can happen any month, which is why many homeowners pair the two: exteriors in the warm season, then interior painting, cabinets and ceilings through the winter. The calendar below shows how each kind of project fits the Maryland year.

When each kind of project fits the Maryland yearTypical for central Maryland and DC. Split months change partway through. Within each season we schedule by the forecast, not the calendar.
When each kind of project fits the Maryland yearMonth-by-month calendar. Exterior painting: best from late April through June and from September to mid-October; workable in March, early April, July, August, late October and early November; off season from mid-November through February. Deck staining: best from late April through June and from September to mid-October; workable in early April, July, August and late October; off season from November through March. Interior painting: good all year. Garage floor coatings in unheated garages: best May through early October; workable in late March, April, late October and early November; off season in winter. Heated garages can be coated year-round.JanFebMarAprMayJunJulAugSepOctNovDecExterior paintingDeck stainingInterior paintingGarage floors(unheated)Best conditionsWorkable, with limitsOff seasonWhen each kind of project fits the Maryland yearMonth-by-month calendar. Exterior painting: best from late April through June and from September to mid-October; workable in March, early April, July, August, late October and early November; off season from mid-November through February. Deck staining: best from late April through June and from September to mid-October; workable in early April, July, August and late October; off season from November through March. Interior painting: good all year. Garage floor coatings in unheated garages: best May through early October; workable in late March, April, late October and early November; off season in winter. Heated garages can be coated year-round.ExteriorDecksInteriorGaragefloorJanFebMarAprMayJunJulAugSepOctNovDecBest conditionsWorkable, with limitsOff season

Prep has its own timing

The painting window is only part of the schedule. Siding should be washed and fully dry before primer, which usually means soft washing at least a day or two ahead. Rotted trim, sills and fascia need to be replaced and primed before finish coats, so wood rot repair is planned into the first days of the job rather than discovered halfway through.

Decks follow slightly different rules. New pressure-treated lumber usually needs to dry for several weeks before it will absorb stain, and stain should not go on in direct hot sun. See our notes on deck and fence staining for timing.

When to book

Spring and early fall fill up first. If you want a May or September start, the best time to get estimates is late winter for spring work and early summer for fall work. That gives time to compare itemized bids, choose colors and, for older homes, plan lead-safe prep before the weather turns favorable.

If your home was built before 1978, read our guide to lead paint in older Maryland and DC homes before you schedule, since containment and cleanup add time to an exterior job.

Frequently asked questions

Can you paint a house exterior in winter in Maryland?

Occasionally, on mild days with low-temperature paint, but it is rarely worth the risk. Short days, cold nights and frequent dew leave very little time for paint to set. We schedule exterior work from spring through mid fall.

How long does an exterior paint job take?

A typical single-family home takes about one to two weeks, depending on size, the amount of repair, and how many hours each day the weather allows. Fall jobs run longer per house because the usable day is shorter.

Is it bad to paint in direct sun?

Painting a wall in hot direct sun makes the paint dry too fast, which can leave lap marks and weaken adhesion. We follow the shade around the house in summer.